Compressor power supply – Gerresheimer industrial site

In 2024, Newelec supported the Gerresheimer Group in strengthening its production capacities by designing and installing a customized electrical solution to power three new air compressors.

The service included the study, design, and production of a CUBIC 4000A form 4A panel, as well as three polyester boxes for star-delta power supply. Carried out in a demanding industrial environment, this project required approximately 480 hours of study and manufacturing.

This project illustrates Newelec’s ability to respond to complex technical challenges with rigor, safety, and compliance.